How To Fix MPN02001 - Das Material & ist kein führendes Material, Planung nicht zulässig.


MPN02001 - Overview

  • Message type: E = Error

  • Message class: MPN02 - MPN Message: Materials Planning

  • Message number: 001

  • Message text: Das Material & ist kein führendes Material, Planung nicht zulässig.

  • Show details Hide details
  • Was verursacht dieses Problem?

    Material requirements planning for inventory-managed manufacturer
    parts, which are organized in
    <DS:GLOS.3608C3DABA271348E10000009B38F91F>MPN-MRP sets</>, only takes
    place on the <DS:GLOS.360B297326F41628E10000009B38F984>leading material
    </> of the set. Therefore, the requirements planning run for an MPN-MRP
    set is only triggered by the leading material. Material &V1& in
    plant/MRP area &V2&/&V4& is part of an MPN-MRP set, for which Material
    &V3& is the leading part.

    Systemantwort

    Processing is terminated.

    Wie behebe ich diesen Fehler?

    Carry out requirements planning for material &V3& in the same plant/MRP
    area.

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


MPN02001 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author