Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix MPE_INSTALLATION_MSG084 - Bedarfsdatum v. Reserv. &1 stimmt nicht mit Endedatum Netzplan überein.


MPE_INSTALLATION_MSG084 - Overview

  • Message type: E = Error

  • Message class: MPE_INSTALLATION_MSG -

  • Message number: 084

  • Message text: Bedarfsdatum v. Reserv. &1 stimmt nicht mit Endedatum Netzplan überein.

  • Show details Hide details
  • Was verursacht dieses Problem?

    The requirement date of a reservation is not aligned to the network
    activity?s end date.

    Systemantwort

    The network activity models the assembly of an installation kit. The
    production order controlling the assembly of the installation kit and
    the network activity run in parallel. The end date of the network
    activity therefore needs to be the end date of the production order.

    Wie behebe ich diesen Fehler?

    Align requirement date to end date of network activity.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


MPE_INSTALLATION_MSG084 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author