Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 485
Message text: Terminierung abgebrochen, siehe Protokoll
When scheduling, an error occurred that was the reason for the
termination, for example, the order quantity could not be converted
into the unit of measure of the rouing. An error message was recorded
in the scheduling log.
Planned orders were not scheduled and no capacity requirements were
created.
Display the scheduling log. This log is not saved in the system so you
have to schedule the planned order first so that the system can record
it.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD485
- Terminierung abgebrochen, siehe Protokoll ?Get instant SAP help. Start your 7-day free trial now.
MD484
Kein gültiger Arbeitsplan auswählbar
Was verursacht dieses Problem? The automatic selecction for routing selection (routing, rate routing or master recipe) is not possible.Systemantwor...
MD483
Arbeitsplan nicht vorhanden
Was verursacht dieses Problem? Routing selected could not be read from the database.Systemantwort The planned order is not scheduled and capacity...
MD486
Terminierung ausgeführt, Protokoll enthält Fehlermeldungen
Was verursacht dieses Problem? When scheduling, an error occurred that was not the reason for the termination, for example, an error in the quantit...
MD487
Terminierung ausgeführt, Protokoll enthält Info-Meldungen
Was verursacht dieses Problem? When scheduling, messages were recorded in the scheduling log containing information on the automatic selection of t...