Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 419
Message text: &1: &2 &3 (U1)
In the rescheduling check, the system calculated a date to which the
receipt is to be brought forward (rescheduled in) to avoid a material
shortage.
The rescheduling date displayed is the date on which the receipt is to
be available for MRP. This includes the goods receipt processing time.
If this is not zero, this information is displayed as well as the
required goods receipt date.
This exception is displayed in the MRP list, and in the
stock/requirements list.
Check whether the receipt can be brought forward.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD419
- &1: &2 &3 (U1) ?Get instant SAP help. Start your 7-day free trial now.
MD418
&1: &2 &3 (V3)
Was verursacht dieses Problem? The order proposal was manually changed in the single-item planning run. Das System gibt eine Fehlermeldung aus und ...
MD417
&1: &2 (V2)
CAUSE& The order proposal BOM was re-exploded in the planning run. Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Tra...
MD420
&1: &2 &3 (U2)
Was verursacht dieses Problem? In the rescheduling check, the system calculated a date to which the receipt is to be moved out (rescheduled out) to...
MD421
&1: &2 &3 (U3)
Was verursacht dieses Problem? There is no requirements for this receipt. It should be reversed to avoid unnecessary warehouse stock.Systemantwort ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.