Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 404
Message text: &1: &2 (N2)
In the MRP list, this exception message displays:
that the planned order was newly created in the last planning run
that the opening date of the planned order lies in the past
The opening period is a time buffer that is planned to provide the
MRP controller with the time necessary for converting planned orders
or purchase requisition.
If the planned order can be converted (to a purchase requisition or
to a production order), it should be converted as quickly as possible.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD404
- &1: &2 (N2) ?Get instant SAP help. Start your 7-day free trial now.
MD403
&1: &2 (N1)
Was verursacht dieses Problem? In the MRP list, this exception message displays that the order proposal was newly created in the last planning run....
MD402
&1: &2 (A9)
Was verursacht dieses Problem? Not used at the moment.Systemantwort Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Tr...
MD405
&1: &2 (N3)
Was verursacht dieses Problem? In the MRP list, this exception message displays that the order proposal was newly created in the last planning run ...
MD406
&1: &2 (N4)
Was verursacht dieses Problem? In the MRP list, this exception message displays, that the order proposal was newly created in the last planning run...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.