Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix MD119 - Bitte Terminanpassung für Primärbedarfsversionen vornehmen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 119

  • Message text: Bitte Terminanpassung für Primärbedarfsversionen vornehmen

  • Show details Hide details
  • Was verursacht dieses Problem?

    You changed the planning period of the scenario so that the validity
    period of one or more planned independent requirements versions no
    longer lies within the planning period.

    Systemantwort

    If you have maintained the validity periods for the planned independent
    requirements, the system checks whether they lie within the planning
    period for the scenario.

    Wie behebe ich diesen Fehler?

    Adjust the validity periods of the versions to suit the planning
    period.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler MD119 - Bitte Terminanpassung für Primärbedarfsversionen vornehmen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker