How To Fix MAHD209 - Konflikt bei Basismengeneinheit zu Material &1 (R/3 = &2, BW = &3).


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MAHD - Messages for Alternative Historical Data

  • Message number: 209

  • Message text: Konflikt bei Basismengeneinheit zu Material &1 (R/3 = &2, BW = &3).

  • Show details Hide details
  • Was verursacht dieses Problem?

    For <DS:GLOS.3526BF19AFAB52B9E10000009B38F974>material</> &SYST-MSGV1&,
    the base unit of measure &SYST-MSGV2& is used in SAP R/3. When loading
    <DS:GLOS.70086ED0D946154EBC7C6B32697A9C30>alternative historical data</>
    (AHD) from SAP BW, however, the unit of measure &SYST-MSGV3& was
    returned.
    The query must always return the AHD in the base unit of measure used
    for a material in SAP R/3.

    Systemantwort

    Due to this conflict, the AHD could not be transferred from SAP BW.

    Wie behebe ich diesen Fehler?

    INCLUDE ISR_BERECHTIGUNG

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler MAHD209 - Konflikt bei Basismengeneinheit zu Material &1 (R/3 = &2, BW = &3). ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant