Message type: E = Error
Message class:  KW - CO-ABC Activity-Based Costing 
Message number: 201
Message text: Version '&' ist im KoRechKreis '&' keine Deltaversion
The given version &V1& is not a delta version (meaning the version has
no reference version) and thus cannot be used for planning in
Activity-Based Costing (CO-ABC).
The planning session is not processed further.
Use a valid delta version for the controlling area.
Alternately, change the version entered to a delta version by entering
a version with version maintenance in the field "Reference version".
A third option is to create a delta version in the controlling area if
none exist.
&FURTHER_HINTS&
Version 000 is never to be used as a delta version.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
KW200 *** Nachrichten CO-ABC Planung  200 - 299 ***
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
KW160 Die Buchungskreiswährung wurde als Objektwährung übernommen
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
KW202 Komponente Prozeßkostenrechnung ist inaktiv
Was verursacht dieses Problem?    Activity-Based Costing (CO-ABC) is inactive for controlling area &V1&, fiscal year &V2&.Systemantwor...
KW203 Stammsatz zur Verrechnungskostenart '&' nicht vorhanden
Was verursacht dieses Problem?    The master data of business process <ZH>&V2&</> includes allocation cost element <ZH>&...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.