Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 031
Message text: Es konnten keine Geschäftsprozesse selektiert werden
No business processes were selected in period &v1& through &v2&.
This can have the following reasons:
No business processes were found for the selection criteria you
specified.
Business processes were selected but you do not have the authorization
for the selected processing type.
Business processes were selected but these are currently locked by
other users.
No further processing is carried out.
Check the entered selection criteria, have your authorizations checked,
or wait until the other users have completed their processing session.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KW031
- Es konnten keine Geschäftsprozesse selektiert werden ?Get instant SAP help. Start your 7-day free trial now.
KW030
Bitte pflegen Sie den Verrechnungstyp
Was verursacht dieses Problem? You have not yet maintained the <DS:GLOS.35C5721770BF6B31E10000009B38F9B6>allocation type</> of the busi...
KW029
Benutzer &1 hat keine Änderungsberechtigung für GProzeß &2
Was verursacht dieses Problem? User &v1& is not authorized to change business process &v2& in controlling area &v3&.Systema...
KW032
Ändern ist nicht möglich (Abhängige Sätze vorhanden)
Was verursacht dieses Problem? The attributes cannot be changed since business processes exist in the period in question, for which corresponding a...
KW033
Bitte Betrachtungszeitraum einschränken (Template nicht eindeutig)
Was verursacht dieses Problem? The template entered in the master record is used for the function you have chosen. If you have selected the analysi...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.