How To Fix KQ129 - Priorität WIP-Ermittlung muß höher sein als Priorität WIP-Auflösung


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KQ - Error Messages for Customizing Product Costing

  • Message number: 129

  • Message text: Priorität WIP-Ermittlung muß höher sein als Priorität WIP-Auflösung

  • Show details Hide details
  • Was verursacht dieses Problem?

    The priority of the status determines the sequence the system uses to
    select a valuation method for WIP calculation.
    You set the following priorities in the standard system:
    Priority <ZH>1</> for the status <ZH>PREL</> (partially released)
    Priority <ZH>1</> or <ZH>2</> for the status <ZH>REL</> (released)
    Priority <ZH>2</> or <ZH>3</> for the status <ZH>DLV</> (delivered)
    If the order has both status <ZH>DLV</> and status <ZH>REL</>, the
    order is processed according to the method for status <ZH>DLV</>. The
    work in process is canceled.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Change the priority.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KQ129 - Priorität WIP-Ermittlung muß höher sein als Priorität WIP-Auflösung ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author