How To Fix KPN071 - Zum PSP-Element &1 ist bereits eine Kalkulation für Material &2 gepflegt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KPN - Costing: Networks, Projects

  • Message number: 071

  • Message text: Zum PSP-Element &1 ist bereits eine Kalkulation für Material &2 gepflegt

  • Show details Hide details
  • Was verursacht dieses Problem?

    Materials in valuated project stock are valued at WBS element,
    material, and plan level.
    The value for WBS element &V1&, material &V2&, and plant &V3& is
    already prescribed by a unit costing.
    The first time goods are received, they are valued using the unit
    costing assigned to the component with the earliest requirements date.

    Systemantwort

    You cannot create any more unit costings for WBS element &V1&, material
    &V2&, and plant &V3&.

    Wie behebe ich diesen Fehler?

    Adapt the existing unit costing as necessary.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KPN071 - Zum PSP-Element &1 ist bereits eine Kalkulation für Material &2 gepflegt ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author