How To Fix KP246 - Kostenstelle & Leistungsart &: Leistung ist 0


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 246

  • Message text: Kostenstelle & Leistungsart &: Leistung ist 0

  • Show details Hide details
  • Was verursacht dieses Problem?

    Activity planning in periods &V3& is not reconciled for cost center
    &V1&, activity type &V2&. The plan activity of activity type &V2& is 0.
    However, a receiver cost center was planned to use this activity
    (scheduled activity).

    Systemantwort

    The SAP System cannot calculate the activity price as this would
    involve dividing by zero. In order to prevent subsequent errors and to
    calculate the activity prices, the SAP System uses scheduled quantity
    as activity quantity. Because this is a serious error, the SAP System
    does not update the results.

    Wie behebe ich diesen Fehler?

    Check planning for activity type &V2& in cost center &V1& and the
    activity scheduled for period(s) &V3&.
    <DS:TRAN.KP26>Activity Type Planning</>
    <DS:TRAN.KP36>Secondary Cost Planning</>

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KP246 - Kostenstelle & Leistungsart &: Leistung ist 0 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author