How To Fix KP246 - Kostenstelle & Leistungsart &: Leistung ist 0


KP246 - Overview

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 246

  • Message text: Kostenstelle & Leistungsart &: Leistung ist 0

  • Show details Hide details
  • Was verursacht dieses Problem?

    Activity planning in periods &V3& is not reconciled for cost center
    &V1&, activity type &V2&. The plan activity of activity type &V2& is 0.
    However, a receiver cost center was planned to use this activity
    (scheduled activity).

    Systemantwort

    The SAP System cannot calculate the activity price as this would
    involve dividing by zero. In order to prevent subsequent errors and to
    calculate the activity prices, the SAP System uses scheduled quantity
    as activity quantity. Because this is a serious error, the SAP System
    does not update the results.

    Wie behebe ich diesen Fehler?

    Check planning for activity type &V2& in cost center &V1& and the
    activity scheduled for period(s) &V3&.
    <DS:TRAN.KP26>Activity Type Planning</>
    <DS:TRAN.KP36>Secondary Cost Planning</>

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KP246 - Kostenstelle & Leistungsart &: Leistung ist 0 ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant