How To Fix KK319 - Planungswährung ist nicht vorhanden


KK319 - Overview

  • Message type: E = Error

  • Message class: KK -

  • Message number: 319

  • Message text: Planungswährung ist nicht vorhanden

  • Show details Hide details
  • Was verursacht dieses Problem?

    The planning currency in which a unit cost estimate is created does not
    exist. This means, for example, that you are trying to plan in
    transaction currency, but the key for this currency is missing.
    This can occur if the switch allowing planning in all currencies was
    changed from 'Not allowed' to 'Allowed' in the control data for the CO
    area settings.
    If planning was already carried out without currencies, that is, only
    in CO area currency, this can no longer be changed as unit costing does
    not know the missing currencies.

    Systemantwort

    You can no longer change the unit cost estimate.

    Wie behebe ich diesen Fehler?

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


KK319 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author