Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 101
Message text: Das PSP-Element & im Projekt & ist nicht für die Faktura freigegeben
You are attempting to perform <DS:GLOS.results_analysis>results
analysis</> on <DS:GLOS.WBS_element>WBS element</> &v1& in
<DS:GLOS.project>project</> &v2&.
However, this WBS element is not a billing element.
This means that you cannot perform results analysis.
The system cannot perform the desired function.
Check whether you have entered the correct WBS element in project &v2&.
If you want to carry out results analysis on WSB element &v1&, you have
to change its master data and indicate that it is a
<DS:GLOS.billing_element>billing element</>.
<DS:TRAN.CJ12>Proceed</>
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KJ101
- Das PSP-Element & im Projekt & ist nicht für die Faktura freigegeben ?Get instant SAP help. Start your 7-day free trial now.
KJ100
Den Auftrag & gibt es nicht, bitte überprüfen Sie die Auftragsnummer
Was verursacht dieses Problem? The order you entered does not exist in the system.Systemantwort Das System gibt eine Fehlermeldung aus und erlaub...
KJ099
Die Position gibt es nicht, bitte prüfen Sie die Angaben
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
KJ102
Das PSP-Element & gibt es nicht, bitte Angaben überprüfen
Was verursacht dieses Problem? You are attempting to carry out results analysis on a WBS element that does not exist in the system.Systemantwort ...
KJ103
Der Auftrag & ist zum Löschen vorgemerkt. Keine WIP- o. Erg.-Erm. möglich
Was verursacht dieses Problem? The order you selected is flagged for deletion. The order will be deleted during the next reorganization. You cannot...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.