Do you have any question about this error?
Message type: E = Error
Message class: KI -
Message number: 142
Message text: Aktivieren Sie die Kostenträger im Kostenrechnungskreis &1 in &2.
You have assigned to a cost object, although the "Cost object indicator
has not been set in controlling area &V1& in fiscal year &V2&.
As the "Cost object" indicator has not been set, you cannot execute a
check or a consistent data update in Controlling. The cost objects you
have entered can be used as a true account assignment object, but will
not be updated. If you also post to a cost center, this will only be
debited statistically.
If the limitations detailed under system activities do not present a
problem for you, you can ignore this error message.
To do this, see the Implementation Guide (IMG) "Controlling General"
under workstep <DS:SIMG.SIMG_CFMENUORK3OBA5>"Change Message Control"</>
(message class "KI", message number "142").
If you are using the "Cost object" field to archive your own information
for a posting in the SAP system, you should make use of the enhancement
to the account assignment block, which offers you user-defined fields.
See the IMG "Special Ledger" under <DS:SIMG.SIMG_XXAK_OXK3>"Maintain
account assignment block"</>.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KI142
- Aktivieren Sie die Kostenträger im Kostenrechnungskreis &1 in &2. ?Get instant SAP help. Start your 7-day free trial now.
KI141
Aktivieren Sie die Projekte im Kostenrechnungskreis &1 in &2.
Was verursacht dieses Problem? You have assigned to a WBS element or a network, although the "Project" indicator has not been set in cont...
KI140
Aktivieren Sie die Auftragsverwaltung im Kostenrechnungskreis &1 in &2.
Was verursacht dieses Problem? You assigned an order to an account although Order Management is not active in controlling area &V1& in fisc...
KI143
Aktivieren Sie Immobilien im Kostenrechnungskreis &1 in &2.
Was verursacht dieses Problem? You have assigned to a real estate object, although Real Estate is not active in controlling area &V1& in fi...
KI144
Aktivieren Sie die Ergebnisrechnung im Kostenrechnungskreis &1 in &2.
Was verursacht dieses Problem? You have assigned to a profitability segment, although Profitability Analysis is not active in controlling area &...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.