How To Fix KG1112 - Kein Planungspaket selektiert


KG1112 - Overview

  • Message type: E = Error

  • Message class: KG1 - CO-PA planning

  • Message number: 112

  • Message text: Kein Planungspaket selektiert

  • Show details Hide details
  • Was verursacht dieses Problem?

    You tried to use a planning method. However, a planning method can only
    be executed if you have previously selected a planning package to which
    the planning method can then be applied.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    To select a planning package for which you would like to create or
    change data, double-click that planning package in the tree.
    If you have not yet created a planning package, you need to start by
    defining one. To do this, you can either create a permanent planning
    package or define an "ad hoc planning package" just for the period of
    the run.
    You define "ad hoc planning packages" for a planning level. It can be
    executed once you have selected it by double-clicking the corresponding
    planning level. The settings for the "ad hoc planning packages" are
    lost at the end of the work session. If you want to save the settings,
    you need to create a planning package explicitly.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


KG1112 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author