Message type: E = Error
Message class: K8 - CO Planning: Messages for Function Group KAPP
Message number: 716
Message text: Die Einheit & ist nicht in die Einheit & der Kostenart umrechenbar.
In the resource master data record, you have linked the unit of measure
&V1& of the resource with the unit of measure &V2& of cost element &V3&
<DS:TRAN.KA03>Display cost element</>
However, this is only permitted if the units of measure can be
converted into one another. This means that both units of measure must
have the same dimension (for example, time, length or weight). Your
entry does not meet this condition.
Correct your entry.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
K8716
- Die Einheit & ist nicht in die Einheit & der Kostenart umrechenbar. ?Get instant SAP help. Start your 7-day free trial now.
K8715
Die Bezeichnung zur Ressource wurde nicht gepflegt.
Was verursacht dieses Problem? Resource &V1& has been created without a name.Systemantwort The processing of resource &V1& in the...
K8714
Die Einheit & ist nicht in die Einheit & des Materials umrechenbar.
Was verursacht dieses Problem? In the resource master data record, you have linked the unit of measure &V1& of the resource with the unit o...
K8717
Die Einheit & ist nicht in die Einheit & des Bauteils umrechenbar.
Was verursacht dieses Problem? In the resource master data record, you have linked the unit of measure &V1& of the resource with the unit o...
K8718
Das Umwerten der Ressourcenpreise wurde abgebrochen.
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.