Do you have any question about this error?
Message type: E = Error
Message class: JA - Central error messages, project system
Message number: 036
Message text: Keine Berechtigung für Terminverfolgung (Werk &1, Terminart &2, Akt. &3)
You do not have all the authorizations required for editing or
displaying Monitoring dates. The system checks the authorization for
monitoring dates (C_RESB_TRM) with the value:
Werk (WERKS) &V1&
Terminart (TMART)&V2&
AktivitSt (PS_ACTVT) &V3&
&System_response&
The required activity cannot be executed
Contact your system administration, if you do not have the
autorizations that are necessary for your work.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
JA036
- Keine Berechtigung für Terminverfolgung (Werk &1, Terminart &2, Akt. &3) ?Get instant SAP help. Start your 7-day free trial now.
JA035
Keine Berechtigung für Berechtigungsgruppe &1 Aktivität &2
Was verursacht dieses Problem? You do not have all the authorizations that are necessary to display or edit simulation version &V3&. The au...
JA034
Keine Berechtigung für Projektversionen Aktivität &
Was verursacht dieses Problem? You do not have all authorizations required to display or edit project versions. The system checked the authorizatio...
JA037
Keine Berechtigung für Aktivität &
Was verursacht dieses Problem? You do not have authorization for activity &V1& in progress analysis.Systemantwort Das System gibt eine Fe...
JA100
***** Nachrichten für Funktionsgruppe SAPLCN00 *****
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.