Do you have any question about this error?
Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 111
Message text: Das Offset wird aus dem Planzählerstand neu errechnet
You have entered both an offset and the next
<GL:planned_counter_reading>planned counter reading</>. When you enter
a planned counter reading, the offset is always calculated on the basis
of the counter reading entered.
The system will recalculate the offset.
If you want the system to recalculate the offset automatically,
continue with your processing.
If you want to define your own offset, cancel the planned counter
reading that you entered. The system will then calculate the next
planned counter reading on the basis of the offset.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
IP111
- Das Offset wird aus dem Planzählerstand neu errechnet ?Get instant SAP help. Start your 7-day free trial now.
IP110
Die Zykluslänge muß ein Vielfaches eines Tages sein
Was verursacht dieses Problem? You have maintained the cycle length for a time-based cycle and have entered a value that is not a multiple of one d...
IP109
Zeitbezog. Zyklus; geben Sie nur für leistungsbezogene Zyklen Zähler ein
Was verursacht dieses Problem? You are trying to assign a <GL:counter>counter</> to a time-based <GL:maintenance_cycle>maintenanc...
IP112
Dem Wartungsplan ist nur eine Wartungsposition zugeordnet
Was verursacht dieses Problem? You are trying to display a list of all the <GL:maintenance_item>maintenance items</> for this <GL:pr...
IP113
Die Offsetlänge muß ein Vielfaches eines Tages sein
Was verursacht dieses Problem? You have maintained the offset length for a time-based cycle and have entered a value that is not a multiple of one ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.