Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix GJ555 - Vorauszahlungsanforderung ist für GewB- oder getrB-Partner ungültig.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GJ - Joint Venture Accounting

  • Message number: 555

  • Message text: Vorauszahlungsanforderung ist für GewB- oder getrB-Partner ungültig.

  • Show details Hide details
  • Was verursacht dieses Problem?

    The current venture and equity group cannot be cash called for Net
    Profit Interest (NPI) and Carried Interest (CI)

    Systemantwort

    The current venture cannot be cash called.

    Wie behebe ich diesen Fehler?

    Verify that the venture and equity group are either NPI or CI. If the
    venture is NPI or CI it cannot be cash called, if the venture is not
    NPI or CI, verify that the interest type indicator on T8JQ, i.e. within
    the venture and equity group, is set to blank.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler GJ555 - Vorauszahlungsanforderung ist für GewB- oder getrB-Partner ungültig. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant