Do you have any question about this error?
Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 049
Message text: Auf Umrechnungseinstellungen f. übergreif. Whr bezog. Änderungen gefunden
The current configuration for global conversion settings, which are used
in the project, have been compared with a snapshot of these settings
that was taken at the time when preparations were completed.
If differences in project ledgers are found when you try to complete the
project, the system displays these differences.
In this case, a difference was found related to currency type &V1& and
setting: "&V2&" (&V3&). The technical fieldname is "&V4&".
In general, subsequent configuration changes are not allowed and cannot
be handled properly during data processing. As a result, the definition
of currency type &V1& may have caused inconsistencies.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
In non-production systems, you can change the message type (and even
suppress the message) in
<DS:TRAN.OBA5>Message Control by User</> using the application area
FINS_IC_CUST and message = 049.
If the message type is I (Info), S (Success) or W (Warning), the project
can then be completed.
Note: This function is only supported in non-production systems.
Intermediate changes to the project configuration will always cause an
error message in production systems and the project cannot be completed.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
FINS_IC_CUST049
- Auf Umrechnungseinstellungen f. übergreif. Whr bezog. Änderungen gefunden ?Get instant SAP help. Start your 7-day free trial now.
FINS_IC_CUST048
Einstellungen für Währungsumrechnung geändert (Bukrs &1, Währungstyp &2)
Was verursacht dieses Problem? The currency conversion settings for company codes were changed after the preparation phase of the current project w...
FINS_IC_CUST047
Umrechnungseinstellungen für übergreifende Whr geändert (Währungstyp &1)
Was verursacht dieses Problem? The global currency conversion settings were changed after the preparation phase of the current project was complete...
FINS_IC_CUST050
Änderungen gefunden bezüglich Währungsumrechnungseinstellungen f. Bukrs
Was verursacht dieses Problem? The current conversion settings for company codes have, which are used in the project, have been compared with a sna...
FINS_IC_CUST051
Erweiterungsledger &1 wird verarbeitet, obwohl kein Standard-Ledger
Was verursacht dieses Problem? The extension ledger &V1& will be processed during data processing in the project cockpit. Extension ledgers...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.