Do you have any question about this error?
Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 012
Message text: Änderungen gefunden in Ledger &1, Einstellung: "&2"
The current configuration settings of all ledgers, which are assigned to
the project<(>,<)> have been compared with a snapshot of these settings
that was taken at the time when preparations were completed.
If differences in project ledgers are found when you try to complete the
project, the system displays these differences.
In this case, a difference was found for ledger &V1& in setting: "&V2&"
(&V3&). The technical fieldname in the ledger table is "&V4&".
In general, subsequent configuration changes are not allowed and cannot
be handled properly during data processing. As a result, the current
data of ledger &V1& might be inconsistent.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
In non-production systems, you can reset the data in the project cockpit
first and then reset <LS>Complete Preparations</>. In this way, the
snapshot of the project configuration settings is updated the next time
you perform the <LS>Complete Preparations</> step.
Alternatively, you can change the message type (and even suppress the
message) in
<DS:TRAN.OBA5>Change Message Control</> using the application area
FINS_IC_CUST and message = 012.
If the message type is I (Info), S (Success) or W (Warning), the project
can then be completed.
Note: This function is only supported in non-production systems.
Intermediate changes to the project configuration will always cause an
error message in production systems and the project cannot be completed.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
FINS_IC_CUST012
- Änderungen gefunden in Ledger &1, Einstellung: "&2" ?Get instant SAP help. Start your 7-day free trial now.
FINS_IC_CUST011
Für Ledger &1, Buchungskreis &2 fehlt ein Eintrag
Was verursacht dieses Problem? The configuration settings of the current project were changed after the preparation phase of the project was comple...
FINS_IC_CUST010
Änderungen in Attribut "&1" von Ledger &2, Buchungskreis &3 gefunden
Was verursacht dieses Problem? The project configuration changed after the preparation phase of the project was completed. If you make any changes ...
FINS_IC_CUST013
Auf Ledger &1, Buchungskreis &2 bezogene Änderungen gefunden
Was verursacht dieses Problem? The ledger settings were changed after the preparation phase of the current project was completed. Differences were ...
FINS_IC_CUST014
Konto in Anpassungstyp "&1" für Buchungskreis &2/Kontenplan &3 fehlt
Was verursacht dieses Problem? For company code &V2&, the adjustment category "&V1&" in chart of accounts &V3& is...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.