Do you have any question about this error?
Message type: E = Error
Message class: FARR_INFLIGHT_CHECK -
Message number: 048
Message text: C09: TransaktPreis &3 <> Betrag v. OrigBeleg &4 für LV &2 in Vertrag &1
The total of DOC_AMT_CUMULATE in the deferral item buffer with the
latest deferral item (LATEST_DEFITEM) on the main price condition is not
equal to the transaction price (TRX_PRICE) in the POB data buffer.
Example
The performance obligation POB1 has a deferral with a value of EUR 100
coming from the operational document for price condition PR00 and a
value of EUR -20 coming from the operational document for price
condition K004. The deferral item value totals EUR 80.
Reconciliation Key POB ID Condition Amt. Orig. Doc. (EUR) Latest
Deferral Item Flag
2016001000001 POB1 PR00 100
X
2016001000001 POB1 K004 -20
X
In the master data, POB1 has a transaction price of EUR 90 which is
incorrect.
POB ID Transaction Price(EUR)
POB1 90
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
<ZH>Note:</>The RAI processing is stopped or the manual transaction from the UI is
stopped.
You can search for SAP Notes related to Inflight Check C09 by using the
terms FARR_INFLIGHT_CHECK and C09.
You can check if there is inconsistent data already in the system.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
FARR_INFLIGHT_CHECK048
- C09: TransaktPreis &3 <> Betrag v. OrigBeleg &4 für LV &2 in Vertrag &1 ?Get instant SAP help. Start your 7-day free trial now.
FARR_INFLIGHT_CHECK047
C26: Inkorrekte prosp. abgesp. Menge an AbgrPos. für LV &1 in Vertrag &2
Was verursacht dieses Problem? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG...
FARR_INFLIGHT_CHECK046
C26: Keine Abgrenzungsp. mit prospekt. Abspaltung für LV &1 in Vertrag &2
Was verursacht dieses Problem? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG...
FARR_INFLIGHT_CHECK049
C03: Keine Erfüllungen gefunden für zeitbasierte LV &2 in Vertrag &1
Was verursacht dieses Problem? A time-based performance obligation (POB) with a valid start date and either a valid end date or a duration must alw...
FARR_INFLIGHT_CHECK050
C02: TRX Preis (AbgrPos.) &4 <> gepl. Erlös &3 für Kondition &2 für LV &1
Was verursacht dieses Problem? The sum of DOC_AMT_CUMULATE and PRO_AMT_CUMULATE for latest deferral items for a condition type is not equal to the ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.