Do you have any question about this error?
Message type: E = Error
Message class: FARR_INFLIGHT_CHECK -
Message number: 045
Message text: C17: Inkorrekt kumulierter Betrag an Abgrenzungspos. für LV &1 Vertrag &2
The sum of the revenue quantity delta column on the deferral items in
previous periods for this performance obligation is not consistent with
the posted revenue quantity in the current period.
This can lead to inconsistent records in table FARR_D_DEFITEM.
To determine the correct handling of the revenue quantity posted and the
revenue quantity planned this check sums up the column REV_QTY_DELTA
for all previous periods . The result is then compared to the value of
the posted revenue quantity REV_QTY_POSTED and the splitout quantity
PRO_QTY_CUMULATE in the current period.
This check is performed to the current period and all future periods in
which deferral items exists.
The example bellow illustrates the logic of this check. (It is assumed,
that the current fiscal year is 2018 and the open period is 004.
Furthermore a prospective splitout was performed in period 2018003.)
RECON_KEY,,POB_ID,,CONDITION_TYPE,,REV_QTY_DELTA,,REV_QTY_POSTED,,
PRO_QTY_CUMULATE
2018001001,,POB1,,PR00,,1,,0,,0
2018002001,,POB1,,PR00,,1,,1,,0
2018003001,,POB1,,PR00,,1,,0,,2
2018004001,,POB1,,PR00,,1,,1,,2
2018005001,,POB1,,PR00,,1,,<ZK>3</>,,2
The sum of the revenue quantity in previous periods is 3. In the current
period the revenue posted is 1 and the prospective splitout amount is 2.
No inflight check C17 error is raised.
During the check in the future period 2018/005 an inflight check C17
error is raised. This is due to the incorrect revenue quantity posted
value in column REV_QTY_POSTED. The sum of the revenue amount for
posting in previeous periods is 4. The revenue posted and the
prospective splitout amount add up to 5.
Buffers checked
Performance obligation data buffer:,,MTS_POB_DATA_BUFFER
Deferral items data buffer:,,MTS_DEFITEM_NSTAT_PRICE
The RAI processing is stopped or the manual transaction from the UI is
stopped.
You can search for SAP notes related to inflight check C17 by using the
terms FARR_INFLIGHT_CHECK and C17.
You can also check if there is inconsistent data already in the system.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
FARR_INFLIGHT_CHECK045
- C17: Inkorrekt kumulierter Betrag an Abgrenzungspos. für LV &1 Vertrag &2 ?Get instant SAP help. Start your 7-day free trial now.
FARR_INFLIGHT_CHECK044
C17: Inkorrekt kumulierte Menge an Abgrenzungspos. für LV &1 Vertrag &2
Was verursacht dieses Problem? The sum of the revenue amount delta column on the deferral items in previous periods for this performance obligation...
FARR_INFLIGHT_CHECK043
C26: Mehrere Änderungsarteinträge für Vertragsmodif. für LV &1 Vertrag &2
Was verursacht dieses Problem? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG...
FARR_INFLIGHT_CHECK046
C26: Keine Abgrenzungsp. mit prospekt. Abspaltung für LV &1 in Vertrag &2
Was verursacht dieses Problem? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG...
FARR_INFLIGHT_CHECK047
C26: Inkorrekte prosp. abgesp. Menge an AbgrPos. für LV &1 in Vertrag &2
Was verursacht dieses Problem? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.