Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 205
Message text: Status des Projekts geändert; neuer Status: &2
An activity was carried out that resulted in a predefined status being
reached during the course of the switch project. This status switch
enables the next activity in the process flow to be carried out. For
more information, see SAP Library under <LS>General Ledger Accounting
(FI-GL) </>-> <LS>Configuring General Ledger Accounting </>-> <LS>
Parallel Accounting </>-> <LS>Portrayal Using Parallel Ledgers </>->
<LS>Change in Leading Valuation </>-> <LS>Process Flow of Switch Project
</>.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
FAGL_SWITCH_LEAD_LDG205
- Status des Projekts geändert; neuer Status: &2 ?Get instant SAP help. Start your 7-day free trial now.
FAGL_SWITCH_LEAD_LDG204
Dieser Schritt ist im aktuellen Status nicht erforderlich
Was verursacht dieses Problem? The status of the switch project is already "&V1&". However, the step performed is only required t...
FAGL_SWITCH_LEAD_LDG203
Aktivität wurde nicht erfolgreich durchgeführt; siehe Meldungsprotokoll
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
FAGL_SWITCH_LEAD_LDG206
&1: Sperre ist aktiviert
Was verursacht dieses Problem? Performing the activity set the indicator (the posting block for) "&V1& ".Systemantwort <ZH&g...
FAGL_SWITCH_LEAD_LDG207
&1: Sperre ist deaktiviert
Was verursacht dieses Problem? Performing the activity removed the indicator (the posting block for) " &V1&".Systemantwort <...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.