How To Fix DPR_ENTITY_LINK002 - Arbeit der Aufgabenzuordnung in Bezug auf verfügbare Arbeitszeit zu groß


DPR_ENTITY_LINK002 - Overview

  • Message type: E = Error

  • Message class: DPR_ENTITY_LINK - Roles: Messages

  • Message number: 002

  • Message text: Arbeit der Aufgabenzuordnung in Bezug auf verfügbare Arbeitszeit zu groß

  • Show details Hide details
  • Was verursacht dieses Problem?

    The work defined for the task assignment between role or resource &V1&
    and task &V2& is higher than the maximum working time available.
    The following applies for the maximum working time available:
    Each day is estimated as 24 hours
    The Gregorian calendar applies, that is, the system does not
    differentiate between working days and non-working days
    &V3& resources were used in the calculation, that is, the maximum
    possible Gregorian working time is available &V3& times. Factor 1 is
    used for roles without staffing.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Check and correct the work of the task assignment or check the roles and
    staffings that are used.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


DPR_ENTITY_LINK002 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author