How To Fix DPR_BUPA_LINK006 - Ressourcenzuordn.: zugeordnet. Aufwand für verfügbare Arbeitszeit zu groß


DPR_BUPA_LINK006 - Overview

  • Message type: E = Error

  • Message class: DPR_BUPA_LINK - Roles: Messages

  • Message number: 006

  • Message text: Ressourcenzuordn.: zugeordnet. Aufwand für verfügbare Arbeitszeit zu groß

  • Show details Hide details
  • Was verursacht dieses Problem?

    The assigned effort defined for the assignment of role &V1& to resource
    &V2& is higher than the maximum working time available that was
    determined by the validity period &V3&.
    The following applies for the maximum working time available:
    Each day is estimated as 24 hours
    The Gregorian calendar applies, that is, the system does not
    differentiate between working days and non-working days
    A single resource is used in the calculation, that is, the maximum
    possible Gregorian working time is available once

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Check and correct the assigned effort or the validity of the resource
    assignment.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


DPR_BUPA_LINK006 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker