How To Fix CY749 - Auftrag & Vorgang &: Einschränkung des Endetermins verletzt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 749

  • Message text: Auftrag & Vorgang &: Einschränkung des Endetermins verletzt

  • Show details Hide details
  • Was verursacht dieses Problem?

    Once the operation has been dispatched the finish date constraint is
    violated.
    Possible causes include:
    The constaint date falls at a time when production is not taking
    place.
    The capacity is already committed at the constraint date.
    The operation was manually rescheduled.

    Wie behebe ich diesen Fehler?

    Depending on the cause you can
    Change the available capacity
    Deallocate other operations that are committed to the capacity
    Determine the time of dispatching automatically rather that
    manually.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CY749 - Auftrag & Vorgang &: Einschränkung des Endetermins verletzt ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant