How To Fix CY749 - Auftrag & Vorgang &: Einschränkung des Endetermins verletzt


CY749 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 749

  • Message text: Auftrag & Vorgang &: Einschränkung des Endetermins verletzt

  • Show details Hide details
  • Was verursacht dieses Problem?

    Once the operation has been dispatched the finish date constraint is
    violated.
    Possible causes include:
    The constaint date falls at a time when production is not taking
    place.
    The capacity is already committed at the constraint date.
    The operation was manually rescheduled.

    Wie behebe ich diesen Fehler?

    Depending on the cause you can
    Change the available capacity
    Deallocate other operations that are committed to the capacity
    Determine the time of dispatching automatically rather that
    manually.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


CY749 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker