Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 450
Message text: Planauftrag &1 Vorgang &2 wurde bei der Neuterminierung gelöscht
If you dispatch, reschedule or deallocate a planned order the system
reschedules it. It reads in the new routing to do this.
One of the following problems has probably arisen while the routing was
being read in or during scheduling:
The planned order was now scheduled using different scheduling
parameters.
No valid routing was found.
The operation does not exist in the valid routing.
The original operation and the capacity requirements belonging to it
were deleted.
Check the scheduling parameters and the routing.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
Get instant SAP help. Sign up for our Free Essentials Plan.
CY446 Ändern Fertigungsversion bei Fehler wurde nicht durchgeführt
Was verursacht dieses Problem? In the strategy profile, the planning functions <ZH> <ZK>setup time optimization</></> and &...
CY445 Planauftrag & : Umplanen mit Fertigungsversion wurde nicht durchgeführt.
Was verursacht dieses Problem? If you have set the indicator <ls>Term.resched.with prod.version</> in the strategy profile then the res...
CY451 Änderungen an Vorplanungsplanaufträgen sind nicht vorgesehen
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
CY452 Änderungen an direktgefertigten Planaufträgen sind nicht vorgesehen
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.