Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CX038 - Konfiguration ist unvollständig


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CX - Nachrichten für Konfigurationsprozess

  • Message number: 038

  • Message text: Konfiguration ist unvollständig

  • Show details Hide details
  • Was verursacht dieses Problem?

    Your configuration is not yet complete. The BOM still contains
    configurable components that have not yet been configured.
    Settings in the configuration profile determine whether you can
    configure the components directly or infer values for the components
    from the characteristic values assigned to the superior material.

    Systemantwort

    The system does not transfer material requirements to MRP until the
    configuration is complete and consistent.

    Wie behebe ich diesen Fehler?

    Select the <PF>Conf. structure</> pushbutton. You see an overview of
    all configurable assemblies in the BOM and their configuration status.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CX038 - Konfiguration ist unvollständig ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author