How To Fix CPBR209 - Keine gültige Material-Plan-Zuordnung vorhanden


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CPBR - Error/Warning/Information Messages for Browser

  • Message number: 209

  • Message text: Keine gültige Material-Plan-Zuordnung vorhanden

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to assign an item to an operation. However, there is no
    assignment from the routing for the operation to the BOM material in
    the item. If the item is found in a phantom assembly there is no
    assignment from the routing to the material, into which the phantom
    assembly is inserted.

    Systemantwort

    The system does not create the component assignment.

    Wie behebe ich diesen Fehler?

    Assign the BOM material in the item to the routing for the operation.
    If the item is found in a phantom assembly, assign the material, into
    which the phantom assembly is inserted, to the routing.
    Create the component assignment.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CPBR209 - Keine gültige Material-Plan-Zuordnung vorhanden ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author