Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CP423 - Das Einfügen von Vorgängen in einen ref. Plan ist nicht vorgesehen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 423

  • Message text: Das Einfügen von Vorgängen in einen ref. Plan ist nicht vorgesehen

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to insert one or more operations into a referenced operation
    set or a reference rate routing. However, you cannot insert operations
    into a referenced operation set or reference rate routing.

    Wie behebe ich diesen Fehler?

    Change the referenced operation set or reference rate routing during
    task list maintenance or
    unlock the referenced operation set or reference rate routing.
    Check that the changes in reference operation set or reference rate
    routing work in all routings using the reference operation set or
    reference rate routing.
    Check that the changes made in reference operation set or reference rate
    routing during unlocking no longer work in this routing.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CP423 - Das Einfügen von Vorgängen in einen ref. Plan ist nicht vorgesehen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author