Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix CP325 - Folge &/&/& : Vorgangsnummer fehlerhaft


CP325 - Overview

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 325

  • Message text: Folge &/&/& : Vorgangsnummer fehlerhaft

  • Show details Hide details
  • Was verursacht dieses Problem?

    The number of the last operation in sequence &V3& of task list &V1&
    &V2& is greater than the number of the return operation in the standard
    sequence.
    However, the last operation in parallel and alternative sequences
    must have a number less than the number of the operation after the
    return operation in the standard sequence.

    Wie behebe ich diesen Fehler?

    Check the task list and
    correct the operation numbers in sequence &V3&
    <ZH>or</>
    correct the operation numbers in the standard sequence.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


CP325 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author