Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 278
Message text: Terminierung mit Basismenge 0 des Materials & im Werk &
You want to schedule routings and then transfer the results to the
material master.
The routings for material &V1& are scheduled with a lot size of 0 since
no base quantity is maintained in the material master record.
The only results of scheduling for a lot size of 0 are times that are
independent of lot size, such as queue time or move time.
If necessary, change the base quantity of material &V1& before
proceeding with your scheduling run.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CP278
- Terminierung mit Basismenge 0 des Materials & im Werk & ?Get instant SAP help. Start your 7-day free trial now.
CP277
Material & im Werk & wird fremdbeschafft
Was verursacht dieses Problem? You want to schedule routings and then transfer the results to the material master. You entered an externally procur...
CP276
Kein Plan zu Material & Werk & Selektionsschema & ermittelbar
Was verursacht dieses Problem? No valid task list can be determined from the task list selection.Wie behebe ich diesen Fehler? Define a task list...
CP279
Es wurde kein Material selektiert
Was verursacht dieses Problem? You want to schedule routings. However, the material you entered in the selection criteria does not exist.Wie behebe...
CP280
---------- Pläne sonstiges -----------------------------
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.