Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 205
Message text: Änderungsnummer & überholt vorhandenen Änderungsstand
You are attempting to shift change numbers. Change statuses may not
"pass" each other because of a shift in the change number's date.
However, change number &V1& overlaps with another change status.
This problem can occur, for example, if an object is processed with
several change numbers and you need to shift numbers for one or
several change numbers.
You created an object on 1/1/1994 and changed it with a change number
for 10/1/1994. This change number should be shifted back to 1/1/1993.
However, this shift fails since the change statuses overlap.
Check the routings effected by the shift.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CP205
- Änderungsnummer & überholt vorhandenen Änderungsstand ?Get instant SAP help. Start your 7-day free trial now.
CP204
Änderungsnummer & kollidiert mit vorhandenem Änderungsstand
Was verursacht dieses Problem? You want to shift change numbers. Change number &V1& interferes with another change status. Change statuses ...
CP203
Dynamisierungskriterien der Verwendung & passen nicht zur Verwendung &
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
CP206
Änderungsnummer & kollidiert mit MatPlZuordn Änderungsstand &
Was verursacht dieses Problem? During the date shift, the change status of the material routing assignment which is shifted with change number &...
CP207
Änderungsnummer & überholt mit MatPlZuordn Änderungsstand &
Was verursacht dieses Problem? During the date shift, the change status of the material-routing assignment, shifted with the change number &, e...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.