Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 093
Message text: Nicht alle Fertigungsversionen können geprüft werden
One or more production versions cannot be checked due to one of the
following reasons:
They are currently being edited.
Task list or BOM does not exist in the production versions.
At the moment there is no access to the database.
You do not have the authorization to display or change production
versions.
The production versions that have not been checked are listed at the
end the consistency log.
RESET N1
Repeat the check.
If the error occurrs again, check whether the task lists and bills of
material in the production versions affected have been created in the
system.
If necessary get the authorizations for displaying or changing
production versions from your system administrator.
You require the authorization to change, if you want to update the
check status in a production version.
In Customizing for the master recipe, check the user's authorizations.
The user requires the following authorizations for transaction MM02
(change material) or MM03 (display material):
Authorization object ,,Authorization field Value
Material master: Plant ,,Activity <LS>02</> (Change
material)
(M_MATE_WRK) ,, <LS>03</> (Display
material)
,,Plant Plant in production
,, version
Material master: Maint- ,,Maintenance status Work scheduling
tenance status
(M_MATE_STA)
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CP093
- Nicht alle Fertigungsversionen können geprüft werden ?Get instant SAP help. Start your 7-day free trial now.
CP092
Werk des Plans eingeben
Was verursacht dieses Problem? You want to select with criterion planner group, but did not enter a plant for the task list.Systemantwort A workl...
CP091
Planergruppe &1 im Werk &2 nicht vorhanden
Was verursacht dieses Problem? You want to select with criterion planner group &v1&. This planner group does not exist in plant &v2&...
CP094
Bitte Material zur Fertigungsversion angeben
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
CP095
Änderungsnummer wurde eingegeben, Revisionstand wird ignoriert
Was verursacht dieses Problem? You want to change or create a routing and have entered a change number as well as a revision level. Revision level ...