How To Fix CNV_20100094 - Ziel-Kostenart &2 existiert bereits; impliziter Merge durch Umbenennung


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CNV_20100 - Messageclass for chart of account conversion

  • Message number: 094

  • Message text: Ziel-Kostenart &2 existiert bereits; impliziter Merge durch Umbenennung

  • Show details Hide details
  • Was verursacht dieses Problem?

    When the cost elements that you plan to merge were checked, it was found
    that target cost element &V2& (mapping &V1& -> &V2&) already exists on
    the database.
    However target cost element &V2& is not used as a source cost element (
    &V2& -> XXXX) for another mapping relation.
    This means that cost element &V1& is in fact merged with existing cost
    element &V2& at chart of accounts-dependent cost element master data
    level (CSKA, A level) as well as at controlling area-dependent cost
    element master data level (CSKB, B level).

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    This has the following consequences. You need:
    to find out if the implicit merge is correct from a logical point of
    view
    to explicitely include the entry &V2& -> &V2& to the mapping
    to consider the priority indicator. If the priority indicator is not
    set, it is not clear which settings will take priority when cost
    elements &V1& and &V2& are merged into &V2&.

    Wie behebe ich diesen Fehler?

    <ZH>Regarding item 2:</>
    Include the mapping &V2& -> &V2& into the mapping table so that at least
    the following entries exist in the mapping table:
    &V1& -> &V2&
    &V2& -> &V2&
    If applicable, any other mapping with target cost element &V2&.
    This allows the system to check the merge for logical correctness.
    A troubleshooting activity is associated to this activity which supports
    you in creating the required mapping entries to resolve the implicit
    merges.
    <ZH>Regarding item 3:</>
    Set the priority indicator for one of the entries for which &V2& is the
    target cost element.
    &NOTE&
    It is possible to do the conversion without setting the priority
    indicator. However then you should check the settings in A segment
    (master data in chart of accounts, transaction FSP3) and B segment
    (master data in controlling area, transaction FSS3) for the relevant
    cost element &V2& after the conversion.
    &ADDITIONAL_HINTS&
    The priority indicator must not be set more than <ZH>once</> for all
    merges to a given target cost element. This is also valid for
    cross-chart of accounts merges.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CNV_20100094 - Ziel-Kostenart &2 existiert bereits; impliziter Merge durch Umbenennung ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker