Do you have any question about this error?
Message type: E = Error
Message class: CNV_20100 - Messageclass for chart of account conversion
Message number: 094
Message text: Ziel-Kostenart &2 existiert bereits; impliziter Merge durch Umbenennung
When the cost elements that you plan to merge were checked, it was found
that target cost element &V2& (mapping &V1& -> &V2&) already exists on
the database.
However target cost element &V2& is not used as a source cost element (
&V2& -> XXXX) for another mapping relation.
This means that cost element &V1& is in fact merged with existing cost
element &V2& at chart of accounts-dependent cost element master data
level (CSKA, A level) as well as at controlling area-dependent cost
element master data level (CSKB, B level).
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
This has the following consequences. You need:<ZH>Regarding item 2:</>
Include the mapping &V2& -> &V2& into the mapping table so that at least
the following entries exist in the mapping table:
&V1& -> &V2&
&V2& -> &V2&
If applicable, any other mapping with target cost element &V2&.
This allows the system to check the merge for logical correctness.
A troubleshooting activity is associated to this activity which supports
you in creating the required mapping entries to resolve the implicit
merges.
<ZH>Regarding item 3:</>
Set the priority indicator for one of the entries for which &V2& is the
target cost element.
&NOTE&
It is possible to do the conversion without setting the priority
indicator. However then you should check the settings in A segment
(master data in chart of accounts, transaction FSP3) and B segment
(master data in controlling area, transaction FSS3) for the relevant
cost element &V2& after the conversion.
&ADDITIONAL_HINTS&
The priority indicator must not be set more than <ZH>once</> for all
merges to a given target cost element. This is also valid for
cross-chart of accounts merges.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CNV_20100094
- Ziel-Kostenart &2 existiert bereits; impliziter Merge durch Umbenennung ?Get instant SAP help. Start your 7-day free trial now.
CNV_20100093
Quell-Kostenart &1 existiert nicht
Was verursacht dieses Problem? When the cost elements to be merged were checked, it was found that the source cost element &V1& (mapping &a...
CNV_20100092
Quell-Konto &1 existiert nicht
Was verursacht dieses Problem? When the G/L accounts to be merged were checked, it was found that the source account &V1& (mapping &V1&...
CNV_20100095
Für das Ziel &3 ist mehr als einmal Priorität vergeben
Was verursacht dieses Problem? The priority indicator is set for the mapping &V1& -> &V3& as well as for the mapping &V2&...
CNV_20100096
Priorität auf Sachkonto &1 (keine Kostenart); KstAr-Merge willkürlich
Was verursacht dieses Problem? During the check, the system found that the priority indicator is set for an account &V1& that is a only a G...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.