How To Fix CN682 - Freigabetermin Position &1 Vorgang &2 liegt &3 Tage in der Vergangenheit


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 682

  • Message text: Freigabetermin Position &1 Vorgang &2 liegt &3 Tage in der Vergangenheit

  • Show details Hide details
  • Was verursacht dieses Problem?

    You have triggered the creation of a purchase requisition. The system
    determines the release date as the difference between the delivery date
    and the total derived from the planned delivery time, the goods receipt
    processing time, and the processing time in Purchasing.

    Systemantwort

    The release date is in the past. Since it is not possible for the
    release to be earlier than the current date, the system assigns the
    current date to the release date.

    Wie behebe ich diesen Fehler?

    Check the relevant data for the delivery date and the release date.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CN682 - Freigabetermin Position &1 Vorgang &2 liegt &3 Tage in der Vergangenheit ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant