How To Fix CN079 - Profitcenter der PSP-Elemenete müssen übereinstimmen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 079

  • Message text: Profitcenter der PSP-Elemenete müssen übereinstimmen

  • Show details Hide details
  • Was verursacht dieses Problem?

    A. You want to change the WBS element of a component.
    Profit Center Accounting is active within the scheduled network dates
    for the controlling area of the WBS elements. The WBS element you
    entered is assigned to a different profit center than the original WBS
    element.
    B. You want to reallocate a component that is assigned to a WBS element
    to another activity.
    Profit Center Accounting is active within the scheduled network dates
    for the controlling area of the WBS elements. The WBS element of the
    component is assigned to a different profit center than the target
    activity's WBS element.

    Wie behebe ich diesen Fehler?

    A. Choose a WBS element with the same profit center.
    B. Choose an activity with a WBS element from the same profit center.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CN079 - Profitcenter der PSP-Elemenete müssen übereinstimmen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.