How To Fix CK648 - Referenzkalkulation benötigt Kalkulationen auf Basis 4.0 oder größer


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 648

  • Message text: Referenzkalkulation benötigt Kalkulationen auf Basis 4.0 oder größer

  • Show details Hide details
  • Was verursacht dieses Problem?

    Using reference costing, you are attempting to transfer a cost estimate
    for material &V1& in plant &V2& that has already been saved. However,
    this cost estimate was saved in a Release prior to 4.0A. Such cost
    estimates cannot be transferred using reference costing.

    Systemantwort

    The cost estimate for material &V1& in plant &V2& is not transferred,
    and the material is <ZH>not</> re-costed.

    Wie behebe ich diesen Fehler?

    Calculate the output base for the reference cost estimate in the
    current Release, and save the results.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CK648 - Referenzkalkulation benötigt Kalkulationen auf Basis 4.0 oder größer ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author