Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 644
Message text: Für Material &1 im Werk &2 wird Aufteilungsschema &3 herangezogen
The joint production process is costed using material &V1& in plant
&V2&. However, there are no production versions for this material, or
no apportionment structure was specified in the production version
selected.
The system determines the existing apportionment structure &V3& for
material &V1& in plant &V2&.
Costing attempts to apportion the costs using apportionment structure
&V3&.
Check whether the correct apportionment structure was used for the cost
apportionment.
In a production version, define the apportionment structure to be used
for costing.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CK644
- Für Material &1 im Werk &2 wird Aufteilungsschema &3 herangezogen ?Get instant SAP help. Start your 7-day free trial now.
CK643
Matnr &2: Es konnte kein Geschäftsbereich ermittelt werden.
Was verursacht dieses Problem? <DS:GLOS.3526B73AAFAB52B9E10000009B38F974>Partner version</> &V1& requires a business area to be...
CK642
Material &2: Dummy-Profit-Center wird zur Partnerermittlung herangezogen.
Was verursacht dieses Problem? <DS:GLOS.3526B73AAFAB52B9E10000009B38F974>Partner version</> &V1& requires a profit center to be...
CK645
Beim Lesen des CO-Objekts &1 ist ein Fehler aufgetreten.
Was verursacht dieses Problem? Preliminary order costing calculates the costs of the direct production material &V2& in plant &V3& ...
CK646
Material & im Werk & besitzt fehlerhafte Kostenschichtung.
Was verursacht dieses Problem? Material &MSGV1& in plant &MSGV2& does not have the necessary error-free cost estimate.Systemantwort...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.