Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 525
Message text: vorgemerkte oder freigegebene Plankalkulation ist inkonsistent
Material &v1&, valuation area &v2&, valuation type &v3&:
The marked (future), released (current) or previous
<DS:GLOS.3526B6DFAFAB52B9E10000009B38F974>standard cost estimate</> for
the above material is inconsistent.
Cost estimates for the material cannot, therefore, be deleted.
Correct the data inconsistency with your own cleanup program.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CK525
- vorgemerkte oder freigegebene Plankalkulation ist inkonsistent ?Get instant SAP help. Start your 7-day free trial now.
CK524
Plankalkulation am zukünftigen Materialstammanker ist inkonsistent
Was verursacht dieses Problem? The following was established within &v3&: You are attempting to mark the standard cost estimate of material...
CK523
Plankalkulation in der Buchungsperiode &4 ist inkonsistent
Was verursacht dieses Problem? In &v3&, the following was established: You are attempting to mark the standard cost estimate for material &...
CK526
Kalkulation zum Material &1 Bewertungskreis &2 ist gesperrt
Was verursacht dieses Problem? The cost estimate for material &v1&, valuation area &v2&, valuation type &v3& is locked by u...
CK527
Plankalkulation der zukünftigen Periode &2 ist vom Benutzer &4 gesperrt
Was verursacht dieses Problem? The following was established in &v3&: You are attempting to <DS:GLOS.marking>mark</> the standa...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.