How To Fix CK464 - Für Material & im Werk & wurde Losgröße aus Kalkulationssicht übernommen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 464

  • Message text: Für Material & im Werk & wurde Losgröße aus Kalkulationssicht übernommen

  • Show details Hide details
  • Was verursacht dieses Problem?

    In sales order costing, the lot size for individual requirements
    materials should be determined dynamically. You specified this in
    Customizing for Product Cost Controlling with the <DS:DE.CK_LOSDR>Pass
    on lot size</> indicator.
    The <DS:DE.SBDKZ>secondary requirements indicator</> &V3& in the MRP 2
    view of the master record of material &V1& in plant &V2& is set.
    Although material &V1& is controlled by individual requirements, there
    is a higher-level material in the structure that is controlled by
    collective requirements.

    Systemantwort

    The system uses the costing lot size in the costing view of the master
    record of material &V1&.

    Wie behebe ich diesen Fehler?

    Check whether the secondary requirements indicator &V3& in the material
    master record is correct.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CK464 - Für Material & im Werk & wurde Losgröße aus Kalkulationssicht übernommen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker