How To Fix CK395 - Es konnte keine passende zukünftige Plankalkulation übernommen werden


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 395

  • Message text: Es konnte keine passende zukünftige Plankalkulation übernommen werden

  • Show details Hide details
  • Was verursacht dieses Problem?

    For material &v1& in plant &v2&, the system tries to find a future
    standard cost estimate according to the transfer strategy. The system
    could not find a future standard cost estimate although the material
    master record contains a future planned price.
    This is due to any of the following:
    A new cost estimate overwrote the old costing results.
    The old results were deleted in a reorganization run.

    Systemantwort

    If there are more transfer strategies for transfer control key &v3& in
    Customizing, the system looks for the appropriate costing results.

    Wie behebe ich diesen Fehler?


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CK395 - Es konnte keine passende zukünftige Plankalkulation übernommen werden ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker