Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CK271 - Kalkulationslauf & & wurde abgebrochen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 271

  • Message text: Kalkulationslauf & & wurde abgebrochen

  • Show details Hide details
  • Was verursacht dieses Problem?

    Costing run &V1& &V2& was cancelled on account of a costing that was
    already locked. The lock was caused because another costing run or cost
    estimate (online) was being performed at the same time.

    Wie behebe ich diesen Fehler?

    You have to make sure that cost estimates using the same master data are
    not performed at the same time.
    You can still cost the costing levels that were not included this time
    later on.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CK271 - Kalkulationslauf & & wurde abgebrochen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker