Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 716
Message text: Anlage im Bau für & nicht zulässig
You want to assign WBS element &V1& to an asset under construction.
The requesting (responsible) cost center in the WBS element is copied
into the asset under construction. The prerequisite is that the
controlling area of the WBS element and requesting cost center are the
same.
Note: From Release 3.0F, the responsible cost center is copied to the
asset under construction if no requesting cost center was entered.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Correct the requesting cost center, if necessary.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CJ716
- Anlage im Bau für & nicht zulässig ?Get instant SAP help. Start your 7-day free trial now.
CJ715
Bitte Stufe eingeben
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
CJ714
Statistisches PSP-Element: Keine Zuschläge, Abrechnung, etc. &
Was verursacht dieses Problem? A statistical WBS element cannot be settled, nor carry overheads, nor can results analysis be carried out for it. Th...
CJ717
Teilprojekt & ist nicht vorgesehen (Bitte Eingabe prüfen)
Was verursacht dieses Problem? Subproject &V1& does not exist.Systemantwort Processing stopped.Wie behebe ich diesen Fehler? RESET N1 C...
CJ718
Währung des anford. Buchungskreises muß Buchungskreiswährung sein
Was verursacht dieses Problem? The currency of the requesting company code is different to the currency of the WBS elemnt company code.Systemantwor...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.