How To Fix CC146 - Feld & benötigt Länge &, Feldlänge ist jedoch &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 146

  • Message text: Feld & benötigt Länge &, Feldlänge ist jedoch &

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to do a date shift.
    When you do a date shift, the valid-from date for all effectivity
    periods of all linked objects is re-calculated by the system.
    This changes the sequence of effectivity periods on &V1& for BOM &V2&,
    item &V3&.

    Systemantwort

    The system checks whether the BOM is still consistent. The BOM is not
    consistent if, for example, the BOM has already been changed with a
    change number with the same valid-from date as the new valid-from date
    you define in your date shift.

    Wie behebe ich diesen Fehler?

    Since your date shift violates the consistency of the BOM named above,
    you cannot carry out the date shift.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CC146 - Feld & benötigt Länge &, Feldlänge ist jedoch & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker