Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix CC146 - Feld & benötigt Länge &, Feldlänge ist jedoch &


CC146 - Overview

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 146

  • Message text: Feld & benötigt Länge &, Feldlänge ist jedoch &

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to do a date shift.
    When you do a date shift, the valid-from date for all effectivity
    periods of all linked objects is re-calculated by the system.
    This changes the sequence of effectivity periods on &V1& for BOM &V2&,
    item &V3&.

    Systemantwort

    The system checks whether the BOM is still consistent. The BOM is not
    consistent if, for example, the BOM has already been changed with a
    change number with the same valid-from date as the new valid-from date
    you define in your date shift.

    Wie behebe ich diesen Fehler?

    Since your date shift violates the consistency of the BOM named above,
    you cannot carry out the date shift.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


CC146 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author