How To Fix CC141 - Änderungsnummer &: & kollidiert mit vorhandenem Änderungsstand


CC141 - Overview

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 141

  • Message text: Änderungsnummer &: & kollidiert mit vorhandenem Änderungsstand

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to carry out a date shift.
    When you carry out a date shift, the system re-defines the valid-from
    date for each effectivity period of the objects linked to the change
    master.
    This process would change the sequence of effectivity periods of BOM
    &V2&, alternative &V3& on &V1&.

    Systemantwort

    The system checks whether the BOM is still consistent after a date
    shift. This is not the case if, for example, the BOM has already been
    changed using a change number with the new valid-from date you want to
    shift to.

    Wie behebe ich diesen Fehler?

    As the BOM will no longer be consistent if the date shift is carried
    out, you cannot carry out the date shift.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


CC141 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author