Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix C7078 - PSP-Element &: Vorwärtsterminierung ohne Starttermin nicht möglich


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C7 - Scheduling

  • Message number: 078

  • Message text: PSP-Element &: Vorwärtsterminierung ohne Starttermin nicht möglich

  • Show details Hide details
  • CAUSE&
    You want to forward schedule a WBS element, although a basic start date
    has not been entered in either the projection definition, WBS element
    or network header for the relevant activities.
    Network scheduling:
    You want to network schedule a WBS element forwards, although a basic
    start date has not been enterd in the corresponding network headers.

    Systemantwort

    The WBS element is not scheduled.

    Wie behebe ich diesen Fehler?

    Enter a basic start date in at least one of the objects mentioned
    above.
    Network scheduling:
    Enter a basic start date in at least one network header.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler C7078 - PSP-Element &: Vorwärtsterminierung ohne Starttermin nicht möglich ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant