How To Fix C2321 - Terminierung abgebrochen: Gesamtbestätigungstermin existiert nicht


C2321 - Overview

  • Message type: E = Error

  • Message class: C2 - Other messages production orders

  • Message number: 321

  • Message text: Terminierung abgebrochen: Gesamtbestätigungstermin existiert nicht

  • Show details Hide details
  • Was verursacht dieses Problem?

    In mass processing, order &V1& should be scheduled with the total
    commitment date as the order finish date.
    The total commitment date, however, has either not yet been determined,
    or is the 31.12.9999, in other words, either no availability check was
    executed, or during an availability check, no total commitment date
    could be determined.

    Systemantwort

    The scheduling has been terminated.

    Wie behebe ich diesen Fehler?

    Check order &V1&. If necessary, execute the availability check again or
    check the settings for scheduling in the mass processing.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler C2321 - Terminierung abgebrochen: Gesamtbestätigungstermin existiert nicht ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant